The Tanzania Zambia Railway Authority (TAZARA) was constructed as a turn key project between 1970 and 1975. The Project was financed through an interest free loan of RMBY 988 Million (equivalent to US Dollars 500 Million) from the Peoples Republic of China. It started commercial operations in July 1976.
JOB OPPORTUNITIES DETAILS AND MODE OF APPLICATION
TAZARA is an integral part of the southern Africa Regional Rail Transport Network. It is a rail link of approximately 1,860 km. long rising at sea level from the East African port of Dar es Salaam in Tanzania, to New Kapiri Mposhi at 1400m above sea level in the Central African country of Zambia. The railroad is designed with a 1067 mm gauge that permits through traffic operations with contiguous railway of Southern Africa. Equipped with adequate facilities, TAZARA has a designed capacity of 5 million tonnes of freight a year.
JOB VACANCIES-APPLY NOW
 
APPLY FOR JOBS-COVER LETTERS AND CV
Curriculum Vitae (CV) Samples and Writing Tips| Create Your CV online and Download